Ductwork and mechanical equipment routed and coordinated for buildable, serviceable ceiling voids — sized and detailed to fabrication level.
Ductwork and equipment are routed with every other trade's model live in the federation, so sizing, routing and service clearances are resolved before the ceiling void gets locked down.
The same four-stage delivery model, applied to hvac bim.
Duct routing and equipment placement modelled to design intent and code clearance.
Ductwork sized and detailed to LOD 400 fabrication level.
Routing coordinated live against electrical, plumbing and fire in the ceiling void.
Duct schedules and shop drawings issued for fabrication.
We model to the mechanical engineer's design and load calculations — sizing and routing are detailed and coordinated, not re-engineered.
Clearance zones are modelled explicitly and checked in the same clash rounds as physical geometry.
Yes — HVAC is modelled inside the same federated MEPF model as electrical, plumbing and fire, not as a standalone file.